Important Notice: Fort Lauderdale Base Closure

Due to the pending landfall of Hurricane Milton in the area of Florida in the United States, OSRL is transferring response operational control for the Americas Region to OSRL's Southampton base at 4:00 PM EST 7 October 2024. OSRL remains response ready on a global basis.

 

Activate Us

Our activation procedure including contact details and forms for activation, in addition to equipment stockpile and aviation status reports can be found here.

Emergency Contact Numbers

Please note that:

Response services are guaranteed ONLY for Members. Non-members are not guaranteed a response and will be required to sign a Non-member contract. Services and rates differ. Duty managers can be contacted for exercises.

Oil Spill Response Limited Oil Spill Response Limited
  • Presentation
  • Subsea

Planning for Offset Installation of a Capping Stack

Yann Hajeri, Saipem Technical Manager, and Mario Fazio, OSRL Subsea Manager, take a closer look at the use of OSRL Offset Installation Equipment.

  • By Mario Fazio
  • Apr 8, 2021
hero image

Planning for Offset Installation of a Capping Stack

Yann Hajeri, Saipem Technical Manager, and Mario Fazio, OSRL Subsea Manager, take a closer look at the use of OSRL Offset Installation Equipment to deploy a capping stack and equipment when vertical access over the subsea well is not possible.

Download the slides from the Seminar which was conducted. 

Download this document

DOWNLOAD