Mobilisation Methods

OSRL will work in conjunction with the Incident Owner to ensure an efficient and effective response is delivered in proportion to the incident. The response will be coordinated by the OSRL Incident Manager through the Emergency Operations Centre.

The Containment Toolkit system configurations have been designed to provide the most efficient way of mobilising the equipment. Most of the equipment is packed in intermodal units which allow for ease of transport by road, sea or air.

During vessel selection the following factors should be considered:
  • DP Class
  • Draft
  • Crane Capacity
  • Cargo Deck Capacity
  • Trading Restrictions (Cabotage laws, charter restrictions, class restrictions)
Aircraft type is determined by several factors:
  • Airport of embarkation
  • Airport of disembarkation
  • Aircraft availability
  • Aircraft loading restrictions
  • The incident owner's aircraft charter company should be consulted regarding number and type of aircraft.

Minimum Equipment Bundle

Flexible Flowlines and Jumpers
Stored in transportation configuration close to quayside access for mobilisation by sea only

Flexible flowlines and jumpers.jpg

Equipment for one leg:
  • Reel 1 - 2 x 250m Jumpers
  • Reel 2 – 1200m Static Flowlines
  • Reel 3 – 1200m Static Flowlines
  • Reel 4 – 850m Dynamic Riser
  • Reel 5 – 850m Dynamic Riser
  • Reel 6 – Spare, empty
  • Reel Lifting Beam and Cradle
  • 20ft Container 1 – Ancillaries – Bend Restrictor elements
  • 20ft Container 2 – Ancillaries – Bend Restrictor elements, reaction collars, test head and propaflex
  • 20ft Container 3 – Ancillaries – Tether Clamp assemblies and spares
  • 20ft Container 4 – Ancillaries – Lifting beam slings, anodes, repair kit and shield samples

Road - No

Sea - Yes

Air - No

Flowline End Termination Package and Flowspool with Latch and Connectors
Stored in transportation configuration for mobilisation by sea. The equipment can be disassembled and made ready for air/road freighting.

Minimum Equipment Bundle.jpg

Equipment for one leg:
  • 1 Flowline End Termination (FLET) with choke and burst disk assemblies
  • 1 FLET mud mat Interface Assembly Template
  • 1 Flowspool Assembly
  • 2 Flexible flowline connector kits (1 at flowspool end and 1 at FLET end)
  • 2 Flexible jumper connector kits (1 at FLET end and 1 at Capping Stack end)
  • 1 Capping Stack Choke w/ connector
  • Ancillaries
 

Road - Yes

Sea - Yes

Air - Yes

Chemical Delivery Hardware
Stored in its transportation configuration suitable for mobilisation by road, sea and air
Note: A CDA foundation is not part of the Containment Toolkit, only the CDA foundation guide pin is delivered with the Containment Toolkit. The Incident Owner is expected to fabricate Mudmat locally based on existing design.

Chemical Delivery Hardware 1.jpg

Chemical Delivery Hardware 2.jpg

Equipment for one leg:
  • 1 Coil Tube Termination Head (CTTH)
  • 1 Chemical Distribution Assembly (CDA)
  • 4 Flying Leads Deployment Rack for 1" hose (FLDR)
  • 7 Flying Leads Deployment Rack for 2" hose (FLDR)
  • 4 Off Flying Lead 500 meter 1"
  • 7 Off Flying Lead 250 meter 2"
  • Quick connectors, Receptacles High Flow stabs, FLOTs
 

Road - Yes

Sea - Yes

Air - Yes

Transfer Pumps, Incinerator Pumps & Coolers
Stored in transportation configuration for mobilisation by road, sea and air

 Transfer Pumps, Coolers & Incinerator Pumps.jpg

Equipment for one leg:
  • 1 Liquid Transfer Pump package consisting of a fully skidded Transfer pump assembly with 3 x 50% Pump
  • 1 Incineration Pressure Pump package consisting of a fully skidded Incinerator pump assembly with 3 x 50% Pump
  • 1 Liquid Cooler skid consisting of Fully skidded Liquid cooler package with 2 x 100% Plate and Frame gasketed coolers. Flow 110m3/hr
  • Operational spares for above skids
 

Road - Yes

Sea - Yes

Air - Yes

Hose End Valves
Stored in transportation configuration for mobilisation by road, sea or air

Hose End Valves.jpg

Equipment for one string:
  • One 20" Hose End Valve
  • One lifting ring with swivel function
  • One set of assembly tools
  • One set of spares and consumables
  • Hydraulic Torque Wrench Set
Road - Yes

Sea - Yes

Air - Yes

Marine Offloading Hoses
Stored in transportation configuration for mobilisation by road, sea or air

Marine Offloading Hoses.jpg

Equipment for one string:
  • One 8" flexible floating hose arrangements
  • One set of assembly and installation tools (in ULD)
  • One set of spares and consumables (in ULD)
Road - Yes

Sea - Yes

Air - Yes

Flowline Lifting Tool

Flowline Lifting Tool.jpg

Two Flowline Lifting Tools Road - Yes

Sea - Yes

Air - Yes

Swivels
Stored in transportation configuration for mobilisation by road, sea or air

Swivels.jpg

Equipment for one leg:
4 Swivels
Road - Yes

Sea - Yes

Air - Yes

All documentation is available on the OSRL EDMS (Electronic Document Management System). For access to this site please contact your Subscriber Technical Advisory Forum (STAF) representative or contact the OSRL document controller via documentcontrol@oilspillresponse.com